MSc Projects
Many of our researchers offer projects within their area of expertise. The projects are usually 30 or 60 ECTS, but it will often be possible to fit the project to your needs.
Expand for project description
Advances in sequencing and quantitative genetics have produced large QTL datasets, yet most individual studies still suffer from low resolution and limited stability across environments. This project applies bioinformatics-driven Meta-QTL (MQTL) analysis to integrate QTL results from many independent experiments and identify high-confidence genomic regions that consistently control important agronomic traits.
Students will gain experience in literature mining, QTL data extraction, trait standardization and the computational integration of diverse datasets. Using specialized software and custom scripts, QTLs will be projected onto a common reference map, allowing precise confidence interval refinement and the identification of consensus MQTLs with substantially improved accuracy. Students will also use modern genomic tools including genome alignment, candidate-gene discovery, data visualization pipelines and comparison with GWAS signals to assess the biological significance of the refined MQTLs. A major emphasis will be on creating a bioinformatics workflow that is reproducible, transparent, and scalable. Students will learn data-driven techniques for filtering low-quality QTLs, performing statistical aggregation, ranking MQTLs by stability and linking them to functional annotations and pathway insights. The final output is a high-quality MQTL atlas that highlights stable, breeder-ready genomic regions suitable for marker development, genomic selection and targeted trait improvement.
This project offers an excellent training platform for students interested in computational biology, quantitative genomics and applied plant breeding, providing direct experience with real genomic datasets and cutting-edge analytical approaches. The project is based at SLU Alnarp.
Supervisors: Nikwan Shariatipour and Mahbubjon Rahmatov

Agriculture in northern Sweden is challenged by a short growing season and very long day length, which restricts proper crop maturity. One potential strategy to compensate for this limitation is to use gene editing to modify selected genes and thereby enabling the crop to produce a commercial yield in longer daylight during Nordic summer. Our research group is focused on decoding the molecular mechanisms behind vegetative to reproductive phase transition in sweetpotato and identify the direct candidate genes responsible for this growth process. We will implement the findings to generate improved sweetpotato with early maturing and enhanced crop yield agronomic trait suitable for Nordic agriculture.
In this project you will be responsible for identification and validation of candidate genes that are involved in photoperiod mediated signaling in three sweetpotato varieties. The candidate will gain expertise in transcriptomics data mining, RNA extraction, cDNA preperation, RT-qPCR, plant transformation techniques, and molecular cloning that will help in functional characterization of long-day grown sweetpotato varieties. The project is based at SLU Alnarp starting in February 2026.
Supervisors: Adity Majee & Dennis Eriksson

In plant biotechnology, precise control over when and where a gene is expressed is often the difference between success and failure. Many promising traits, such as engineered degradation of unusual fatty acids, novel wax esters, or other storage compounds, should only be active once the seed germinates. During seed development, these same processes would damage the seed, reduce oil yield, or compromise plant fitness, producing the opposite effect of what we aim to achieve. Conversely, if these degradation mechanisms are absent, seed germination and seedling fitness in transgenic lines may be impaired. What is needed are promoters that activate only at germination: silent during seed development, then strongly induced as the radicle breaks through.
In this project, you will contribute to identifying and testing such promoters. Using bioinformatic mining of transcriptome datasets and hands-on experimental work in Arabidopsis thaliana, you will search for candidate germination-specific gene promoters, clone them upstream of reporter genes, and validate their activity in transgenic seeds. Through this work you will gain experience in transcriptome and promoter analysis, molecular cloning and plant transformation, microscopy, GUS/GFP assays, and in linking computational predictions to real biological function.
Supervisors: Kamil Demski and Lizel Potgieter

This project explores the transformative potential of germination in improving the nutritional and functional qualities of wheat. By optimizing germination conditions, the project aims to enhance the bioavailability of key nutrients, reduce anti-nutritional factors, and elevate the levels of health-promoting compounds such as antioxidants and vitamins.
The student will work on assessing the biochemical changes during germination, evaluating health-relevant properties (e.g., glycemic response, digestibility), and exploring processing strategies to create innovative germinated wheat-based food products. This research offers a unique opportunity to contribute to the development of healthier, value-added cereal products with strong relevance to current dietary and wellness trends. This project focuses on extracting and valorizing high-quality proteins from green leafy biomass, such as winter wheat, rye, or agricultural side-streams. Green leaf proteins are rich in essential amino acids and possess strong potential as sustainable alternatives to conventional protein sources in food systems. The project will involve optimizing extraction methods, analyzing functional properties (solubility, emulsification, gelation), and evaluating the nutritional profile and applicability of green leaf protein concentrates in food formulations. This research supports circular bioeconomy goals and aims to unlock new possibilities for plant-based, protein-enriched, and eco-friendly food innovations.

Are you interested in sustainable agriculture and real-world data analysis? Join our project to explore the potential of field cress (Lepidium campestre), a newly domesticated winter-hardy oil crop, to enhance local food security and reduce fossil fuel dependency in the Nordic region.
Background: Northern Sweden's agriculture faces challenges due to harsh climates, low profitability, and limited crop options. While rapeseed and turnip rape are commonly grown, they struggle with poor winter hardiness and low yield stability. Field cress offers a promising alternative due to its winter hardiness and adaptability to the Nordic climate. However, understanding its performance over multiple years and environments is crucial to maximizing its potential.
This MSc project involves analyzing data from two years of multi-location field trials in northern Sweden, comparing: Winter hardiness and survival rates of three oilseed crops, yield performance and stability across different environments, oil content and composition using gas chromatography (GC), and phenological traits. What you will do: Analyze multi-environment trial data to assess performance and adaptability, extract and analyze oil from field cress seeds to determine fatty acid profiles, compare results across genotypes and environments, present findings through visualizations and contribute to a scientific publication. This project is suitable for an MSc student in Agronomy, Plant Breeding, Biology, Genetics, or a related field. The project is based at SLU Alnarp in collaboration with SLU Umeå, starting in Fall 2025.
Read more about field cress here.

Are you interested in new protein food from grain legumes which is locally sourced and produced? Faba bean and pea are two crops with very promising protein characteristics and good alternatives to soya, although to the major part so far are used as animal feed. This project focuses on industrial protein concentrates from faba bean and pea, and their new use in extruded food products. Functional properties and structure of faba/pea extrudates differ depending on the product size and type, as well as on the protein chemistry. This is of a particular relevance for the extrudates when absorbing water and fat in meat replacers. You will have a unique opportunity to work with newly produced faba/pea protein concentrate foods and to find out key answers to the questions that the food producers and researchers have.
We aim to address few major questions on the faba/pea protein concentrates and determine their protein profile and chemistry behind before and after extrusion. We also aim to characterize structure and morphology of the extrudates in order to explain water and fat absorption in the newly extruded meat replacers. The project is a collaboration with industrial stakeholders within SLU Grogrund which is a centre for breeding of food crops.

Blackleg disease, caused by Lepthospaheria maculans, is a serious disease of Brassica crops, oilseed rape (Brassica napus) and turnip rape (B. rapa). Both of these species account for more than 95% of oilseed production in Sweden. Cultural practice is not effective method to control the disease. Fungicide applications are linked to health and environmental risks and the alternatives are getting less due to increasing restrictions. Developing varieties of B. napus and B. rapa resistant to blackleg is considered the most sustainable approach for managing the disease. Germplasm collection, identifying resistant genotypes within the germplasm, and dissecting the genetic basis of the resistance trait are crucial steps for developing resistance varieties.
In this project, B. napus and B. rapa accessions collected from the Nordic region and globally will be screened for resistance against Blackleg disease. Using the genotype data of these accessions, a genome-wide-association study (GWAS) will be conducted to identify genomic regions, genes, and alleles linked to the Blackleg disease. The project involves methods such as culturing of L. maculans, conducting disease screening assays, phenotyping of the resistance, GWAS analysis to detect marker-trait association, and bioinformatics analysis of the genome regions of interest.

Pheromones are the best alternative to conventional pest control with pesticides for growers in the horticultural and agricultural sectors. However, chemical production of pheromones is both costly and can give rise to environmentally hazardous waste. This project focuses on oil crops that produce precursors for pheromones in seed oil. These precursors are fatty acids and can be converted to pheromones. No oil crop produces these fatty acids naturally. Still, by transferring the appropriate enzymes with gene technology, plants can be created that contain many of the desired fatty acids in substantial quantities. You will work with four transgenic lines of the oil crop Camelina sativa that produce different target fatty acids and the amount of them varies depending on which fatty acid it is.
Your task will be to figure out how we can improve these lines. You will use lipid analysis together with enzyme studies of the different transgenic Camelina lines to find bottlenecks in the plant's ability to synthesize these target fatty acids. The results will be used to create a map of the flow of the target fatty acid into seed oil.

Heavy metals are released into soils from natural and anthropogenic sources and are crucial for the physiological and metabolic activity of an organism. However, beyond certain concentrations, heavy metals are toxic to the habitat and living organisms. Heavy metal contamination in agricultural fields is one of the main constraints limiting crop yield and quality. Consuming edible parts or food products produced in heavy metal-contaminated soils increases the risk of chronic diseases such as diabetes, cancer, and kidney and immune system dysfunction. The presence of Cadmium (Cd), which is one of the heavy metals, in Swedish agricultural soils has been reported and there are initiatives to reduce Cd levels in major crops produced in Sweden. This requires applying sustainable methods to reduce the Cd concentration in agricultural fields for instance using phytoremediation. Phytoremediation uses plants to clean up contaminated environments. It is eco-friendly method and improves soil fertility and soil microbiome composition. One of the plants with phytoremediation potential is Lepidium campestre, targeted for domestication as a new bioenergy crop.
In this project, you will investigate the phytoremediation efficiency of L. campestre in Cd-contaminated soils. The methods applied include measuring Cd content of contaminated soils and in tissues of L. campestre, and conducting expression analysis of Cd-transporter genes. Developing crops with phytoremediation potential is crucial for reducing heavy metal contamination in agricultural soils, thereby improving food safety and crop productivity. In war-torn regions, where heavy metals from military activities often contaminate the soil, such crops could play a key role in restoring agricultural land, making it safer to produce food and helping communities recover from conflict.

Green leaves, e.g., in the form of sugar beet leaves or lucerne, can be a source of protein for both humans and non-ruminant animals. But first the proteins need to be extracted. Our process method start with pressing juice from the leaves, resulting in a green juice containing most of the protein, and a fibrous pulp. However, the recovery rates are low as much of the protein remains in the pulp.
In this project, we investigate different methods for increasing the protein recovery and you would be part of this development.
Cultivation of crops in North Sweden faces a major challenge in the short field season, which limits the number of crops that can be grown and reach full maturity. One way to possibly compensate for the short field season could be to identify, through plant breeding, crop varieties that have the ability to take advantage of the greater number of sun hours (long days) during June and July when northern Sweden basically has continuous light. Such varieties can then conceivably develop faster and reach maturity within the shorter field season available. When breeding for better variants of the oilcrop turnip rape (Brassica rapa spp olifera) for cultivation in North Sweden, beside improving its winter hardiness it is also important to take into consideration its ability to respond positively to the long-day light conditions.
This project will use accessions of turnip rape identified to respond positively to constant light (mimic long day conditions in the North). These accessions will be grown in the Biotron under normal day/night light conditions and constant light respectively. Different phenotypic traits of the plant material will be recorded at specific time points as a measure of the different accession. Plant material from the different accessions and in the different light treatments will be sampled and analysed for gene expression (trancriptome analysis). Phenotypic and genotypic data will be analysed for markers (SNP) linked to a positive response to the long day condition.